Steps for Developing | A Downtime Tracking System
Step 1 |
WHAT - Determine what downtime incidents you want to capture and the level of detail that you want to capture for each incident. |
|
Step 2 |
WHERE – Equipment or Production Area that you want to capture the downtime incidents. The flexibility of the VersaCall VT2000 System provide for the option of rolling it out on a limited basis and expanding it later. |
Step 3 |
HOW - The VersaCall System captures downtime incidents with inputs from line operators; machine or equipment PLCs (including fault codes), switch contacts, sensors and voltage shifts. |
Step 4 |
Determine the input modules that you require to capture the downtime. |
Step 5 |
Determine your reporting and communications requirements including Real Time visibility of downtime incidents. |
Step 6 |
Roll Out the System |
|
|