Steps for Developing | A Downtime Tracking System

 

Step 1
WHAT - Determine what downtime incidents you want to capture and the level of detail that you want to capture for each incident.
Step 2
WHERE – Equipment or Production Area that you want to capture the downtime incidents. The flexibility of the VersaCall VT2000 System provide for the option of rolling it out on a limited basis and expanding it later.
Step 3
HOW   - The VersaCall System captures downtime incidents with inputs from line operators; machine or equipment PLCs (including fault codes), switch contacts, sensors and voltage shifts.
Step 4
Determine the input modules that you require to capture the downtime.
Step 5
Determine your reporting and communications requirements including Real Time visibility of downtime incidents.
Step 6
Roll Out the System