A revolutionary system that supports multiple applications from Andons to MES.
View our case studies which detail how VersaCall Systems have helped manufacturers all over the world.
The 3M Tape Manufacturing Plant in Hutchinson Minnesota is the largest 3M Facility in North America with 1.3 million square feet of production floor. The facility was experiencing a significant loss of production time due to the response time of support personnel to unanticipated production disruptions.
Caterpillar Inc. has implemented the Caterpillar Production System so as to continue to improve their production processes. One of the areas that required a solution to improve their production processes was to determine an effective way to communicate problems and issues from the assembly line on the production floor.
The first week that we had the VersaCall system installed there were 250 calls placed to assembly support personnel from 5 modules, giving us our first look at the amount of downtime that we were facing. Using the reason code modules we are now able to view and quantify the root cause of our downtime.
“Line downtime due to material, maintenance and line supervisory support was an on-going challenge for each of the separate factories being serviced by the common support groups. Overall downtime was viewed as a significant problem. Site Management had no way to measure downtime and the downtime causes nor the effectiveness of the production line support groups.”
From large corporations to small mom-and-pop shops, VersaCall andon systems can improve productivity and efficiency.
At VersaCall we have an entire department working with customers to mold the technology that provides the best solution in their factory environment.