We have created several case studies which detail how VersaCall Systems have helped manufacturers all over the world.
3M – Recovery of Lost Production
The 3M Tape Manufacturing Plant in Hutchinson Minnesota is the largest 3M Facility in North America with 1.3 million square feet of production floor. The facility was experiencing a significant loss of production time due to the response time of support personnel to unanticipated production disruptions. Learn how we solved their problem...
Caterpillar Inc. – Andon System
Caterpillar Inc. has implemented the Caterpillar Production System so as to continue to improve their production processes. One of the areas that required a solution to improve their production processes was to determine an effective way to communicate problems and issues from the assembly line on the production floor. Learn more about how we improved Catepillar's production...
Hamilton Sundstrand – Visibility of Assembly Downtime Issues
Assembly station downtime due to material, engineering, and supervisory support is an on-going challenge for each of the assembly stations. A lack of data relating to the root cause of each downtime incident was considered an issue. Site Management had no way to accurately measure total downtime of each station and the reason associated with the downtime. Learn how we solved the problem...
Honeywell – Turning Downtime Into Productive Time
Line downtime due to material, maintenance and line supervisory support was an on-going challenge for each of the separate factories being serviced by the common support groups. Overall downtime was viewed as a significant problem. Site Management had no way to measure downtime and the downtime causes nor the effectiveness of the production line support groups. Learn how we solved the problem...
Discover how VersaCall will work for you. Sign up for a free demo...